- Wash, scrub, wash, scrub.
- Fuselage removed from trainer.
- Deteriorated covering stripped from fuselage.
- Hood frame rebuilt; awaiting fabric covering.
- Base frame repaired.
- Turbine working.
- Telegon oscillator restored.
- Base painted – makes a big difference.
Our next step will be to build a new wire spindle.